Difference between revisions of "FM36M1 Product Change Notifications"
From Wiki Knowledge Base | Teltonika GPS
Danielekrau (talk | contribs) |
|||
Line 1: | Line 1: | ||
+ | {{Template:Pcn_intro_FM | ||
+ | | product_name = FM36M1 | ||
+ | }} | ||
==2019.03.11: Top Sticker/Tampography Changes== | ==2019.03.11: Top Sticker/Tampography Changes== |
Revision as of 14:52, 20 March 2019
Main Page > EOL Products > FM36M1 > FM36M1 Product Change NotificationsProduct change notifications (PCN) is the way of informing customers of upcoming changes related to Teltonika products. This includes outward appearance adjustments, hardware improvements, firmware changes, changes to package contents, etc. This page stores information regarding changes to the FM36M1. Below you will find a list of both upcoming and already implemented changes sorted from newest to oldest (top to bottom).
2019.03.11: Top Sticker/Tampography Changes
We would like to inform you, that sticker changed to tampography of FM36M1 device and was updated in factory on the 11th of March.
Change description | ||
---|---|---|
Change type | External/visual | |
Detailed description | Top Sticker/Tampography design changed | |
Old Sticker Version: |
New Tampography Version: | |
Change reasons | 1. The Sticker was changed to Tampography 2. Added Teltonika address label Saltoniskiu st. 9B-1 3. Added WEEE label. (WEEE - Waste from Electrical and Electronic Equipment) 4. Added EAC label. (EAC - Eurasian Conformity mark) 5. Added E26 label. (E26 - E-Mark is the regulations issued by the Economic Commission for Europe) 6. Added CE label. (CE - certification mark that indicates conformity with health, safety, and environmental protection standards) | |
Product release date | Updated tampography will be used from the time when the stock will be sold all leftovers. |
Affected products | ||
---|---|---|
Model | Affected order codes | Order code changes |
FM36M1 | FM36M1******* | No changes |
Change impact | ||
---|---|---|
Risk assessment | No risk factors encountered with this change | |
Suggested implementation plan | No implementation plan needed |
Acknowledgement of PCN receipt | ||
---|---|---|
If no feedback is received within two weeks after the issue date of this notification - Teltonika may accept that this change has been tacitly accepted and can implement the change as indicated above |
To download the pdf version of this notification, click here.