Changes

Line 34: Line 34:  
|}
 
|}
 
==Installation steps==
 
==Installation steps==
<br>
   
1. Requirements: main body of the sensor, probe, extension line, user interface line, couplingagent, 2.8-meter long hose clamp, sand paper and glue.<br>
 
1. Requirements: main body of the sensor, probe, extension line, user interface line, couplingagent, 2.8-meter long hose clamp, sand paper and glue.<br>
 
2. The customers need to prepare: 12V power supply, isolating tape, and duster cloth and paper tissue (used to wipe off grease dirt).<br>
 
2. The customers need to prepare: 12V power supply, isolating tape, and duster cloth and paper tissue (used to wipe off grease dirt).<br>

Navigation menu